Our Approach

OUR APPROACH

A Repeatable, Engineered Solution that is Cost Effective with Guaranteed Results

cmh-engineered (3)

OUR BOMBPROOF SOLUTION

  • Robust, Engineered Solution
  • Repeatable Process
  • Faster
  • Cost Effective
  • Lasts decades
  • Water tight to eliminate I&I
  • Perfectly Level
Untitled (1200 x 687 px) (1)

ASSESS

Problems usually stem from the use of traditional materials such as Concrete Rings, Grout and Shims

3be91afb-0791-43c9-8823-8fab2b715ec5
1b276d0b-b44f-48a6-9ed8-d1e70c68ec6d

EXTRACT FRAME

A common issue for a failed manhole frame is the deterioration of the concrete riser rings

REMOVE CHIMNEY

The concrete rings are removed and we excavate to expose the top section of the MH

19a4c246-133b-4709-8f5b-d41d9931b5d5
89c3a721-59da-4d75-ad3f-a6f1fa962b1a

REPLACE AND LEVEL

The manhole frame is set dead level to the existing grade

BACKFILL WITH CONCRETE

Finish the process with Reinforced High Early Strength Concrete (50+ MPa)

448a0ac8-2b4b-4599-81a8-59f5f918d860